
These pictures are from one of the sheep industries newest facilities located in Iowa.
The buildings are raised ten feet off of the ground and the sheep stand on a plastic slatted floor that is thermal neutral.
This facility keeps the sheep cool and dry in the summer because of the air flow and the thermal neutral properties of the cover as well as the floor.
COVER BUILDING WITH SLATTED FLOOR BENEFITS
- Keeps sheep clean
- Eliminates parasites
- Keeps sheep cool in the summer
- Feed more efficiently
- Clean work environment
- Easier to sort and work with sheep
- No bedding (saves labor)
- Manure is worth more because it is 100% manure
64' x 400' and 64' x 270' Lamb Finishing Facility
Current 1000 Head Lambing/Finishing Facility Under Construction
50' x 240' with 50' x 50' connected commodity building

36' x 700' Lamb Finishing Facility


|